KRONA ROBOT · measurement resource · version 24 October 2026

Record an unloading test that another person can assess

Agree the freight, configuration, timing and acceptance definitions before observing the run. This protocol organizes evidence; it is not a safety procedure, operating instruction or record of KRONA performance.

Run tests only through the site's approved procedures and responsible team. Keep raw evidence and changed conditions alongside the result. A useful report can conclude that the application needs more work.

Use the existing recording sheets

These are blank collection resources. They contain no measured results or acceptance promises.

1. Identify the test and intended decision

2. Describe the filled cartons and route

3. Define the clocks before starting

4. Retain success, interruption and release evidence

5. Calculate with matching boundaries

6. Review before publishing

For operational context, read the pilot acceptance guide, carton-gripper guide and unloading-time guide.